Location | Fukuoka Prefecture |
---|---|
Structure | Steel-framed structure, 2nd floor above ground |
Area | 8,346.56㎡ |
Completion year | 2010 |
[Key Points of Factory Planning]
The food factory manufactures and supplies a packed lunch for convenience stores. We could set up all manufacturing equipment on the first floor because the site has enough space. As a result, we can make one-way manufacturing flow from reception of raw material to product dispatch by placing the manufacturing rooms in its order, reception, storage, preparation, processing, arranging.