NEW PROJECT CASE

Food factories

Packed Lunch Factory (convenience store)
Location Fukuoka Prefecture
Structure Steel-framed structure, 2nd floor above ground
Area 8,346.56㎡
Completion year 2010

[Key Points of Factory Planning]
The food factory manufactures and supplies a packed lunch for convenience stores. We could set up all manufacturing equipment on the first floor because the site has enough space. As a result, we can make one-way manufacturing flow from reception of raw material to product dispatch by placing the manufacturing rooms in its order, reception, storage, preparation, processing, arranging.