Location | Shizuoka Prefecture |
---|---|
Structure | Steel-framed structure, 2nd floor above ground |
Area | 3,100㎡ |
Completion year | 2006 |
[Key Points of Factory Planning]
This factory manufactures school lunch and office packed lunch. The construction was divided into two phases. In the first phase, the land between the two existing factories was used to construct half of new building. In the second phase, half of the function which existing building has was transferred to the new building, and the other half of building was constructed where the existing one was demolished. So, we can complete the construction on the same site without stopping manufacturing line.