Location | Saitama Prefecture |
---|---|
Structure | Steel-framed structure, 2nd floor above ground |
Area | 6,000㎡ |
Completion year | 2007 |
[Key Points of Factory Planning]
An extension was planned when CUMS No.2 was newly built, but the manufacturing system and its flow were not fixed.
The key point of the design was how to coordinate the flow of people and things in order to build an extension.