Location | Aichi Prefecture |
---|---|
Structure | Steel-framed structure, 2nd floor above ground |
Area | 3,986㎡ |
Completion year | 2017 |
[Key Points of Factory Planning]
We built a new factory (cooked rice and ready-made food) on the same site of the process center. As the products are sorted and shipped at the same center, a transportation passage was built on the second floor to connect the two buildings not to block incoming vehicles traffic.